Engineering activities
We take care of infrastructure design, safety, communication, financial management, property handover, subcontractor management, subcontractor tender management, quality control, and evaluation of technical solutions.
Thanks to our comprehensive approach, you benefit from a partner who oversees the entire process from initial design to successful project handover.
Our experts coordinate all key steps, minimize risks, and ensure that the resulting solution is reliable, safe, and sustainable in the long term.
Audit of work actually performed
Systeming CZ is independent from contractors and is therefore a neutral company, which allows us to independently assess and inspect components supplied and work performed by any company in the field of critical systems. Our task is to assess the work actually performed in terms of the required quality and quantity.
Functional tests and commissioning
Between the completion of implementation and the start of operation of critical equipments, it is necessary to take an intermediate step to verify the design parameters of the data center infrastructure. Functional tests will reveal any deficiencies in the configuration of individual subsystems that could affect the functionality of the entire system in the future.
We have a detailed understanding of the activities and functionality of individual subsystems, which allows us to thoroughly analyze the installed performance, settings, and correct startup of the system. We have developed a methodology for commissioning technological facilities with a detailed description of functional tests, which allows us to quickly adapt to a given type of system.
Assessment of the standard of project documentation
In our analysis, we assess the capacity, functionality,
and expected (real) availability of the infrastructure based on its topology. We focus on individual parts of the system, component redundancy,
and distribution routes. Critical systems depend
on the successful integration of no fewer than 16 individual subsystems.
The analysis is based on the characteristics of individual subsystems, but the assessment will be determined for the entire data center. The standard assessment is an independent evaluation of the infrastructure for the future operator in order to determine the summary of characteristics and operational needs.